SAU New Settlements Connection Road Construction


Project owner: Adapazarı Metropolitan Municipality
Employer: Kolin Construction Manufacturing and Trade Joint Stock Company
Place / Path of the Work: Adapazarı / 2006-2007
Last Discovery Fee: 
11.641.529,00 TL
Building Technique Applied: 2x2 lane road with a length of 10.5 km and a width of 23 m was constructed.284,972.73 m3 excavation, 121,031.24 m3 side drilling excavation, 301,818,50 m3 quarry hole excavation, 250,000 m3 foundation sub-base, 72,000 tons of hot bituminous mixture, 17,009 m middle median border, 12,735 m sidewalk, 4655 m3 Reinforced concrete pavement construction, pressure concrete on pavement, replacement of rainwater drainage lines, Sedaş-Agdaş-Türk Telekom lines, road and intersection lighting works and all traffic signs.

 

 
Other Photos
 
 
Yahyalar Mahallesi Ankara Caddesi No: 111 Adapazarı / SAKARYA TURKEY