Employer: SAKARYA II. OSB SANAYİ GENEL MÜDÜRLÜĞÜ Place / Time of Work: Hendek / 2016 Building Technique Applied: Digging of 9000 m3 old asphalt with trimer and laying of 56.500 tons of wear-binder layer Sakarya 2. OSB binder and wear layer and raising of waste water, rain water, natural gas caps to the road level